Cost Control
Our approach:
- Cost is controlled by Design
- Control the Design -- Control the Cost
- Control Cost through Pre-Construction Design Services
Pre-construction Design Services are a specialty at Viola Constructors. The cost is typically 1% or less, while savings are 5% to 10% of the total Project Cost. Our Services include:
- Value Engineering
- Constructability Analysis
- Building Permit Fee Reduction